维普中文期刊产品整合服务
25篇 您的检索式:作者名="Najid"
    题名 作者 年代 出处 被引量
1时间不一致性货币政策的理论建模与政策含义——基于新政治经济学的视角显示文摘本文以政策制定者与社会公众因事前利益冲突所导致的政策时间不一致性问题为核心,在新政治经济学框架中运用主从博弈方法,对时间不一致性货币政策进行研究。研究发现:第一,事前利益冲突是导致时间不一致性的重要原因,也是政策内生化建模的重要途径;第二,主从博弈能将事前利益冲突、序贯政策制定与理性预期引入模型,并对时间不一致性政策理论建模有重要意义;第三,模型构建应考虑目标差异、状态变量转移动态、宏观经济环境及政策体制间的传导关系,使模型具有均衡解,并能分析解的经济性质;第四,增强可信性是解决货币政策时间不一致性问题的关键,一国应利用汇率和利率政策建立与经济发展阶段相适应的'承诺机制'或'名义锚',从而促进经济稳定增长。路继业 Najid Ahmad 张冲 2016经济科学2016,,5:2
2Potential generated by a massive inhomogeneous straight segment显示文摘The discoveries of binary asteroids have opened an important new field of research concerning the calculation of potential generated by irregular bodies.Some of them have an elongated shape.A simple model to describe the motion of a test particle in that kind of potential requires consideration of a finite homogeneous straight segment.We construct this model by adding an inhomogeneous distribution of mass. To be consistent with the geometrical shape of the asteroid,we explore a parabolic profile of the density.We establish the closed analytical form of the potential generated by this inhomogeneous massive segment.The study of the dynamical behavior is fulfilled by the use of Lagrangian formulation,which allows us to calculate some two and three dimensional orbits.Nour-Eddine Najid El Haj Elourabi Mohamed Zegoumou 2011Research in Astronomy and Astrophysics2011,11,3:2
3Integrated production planning and preventive maintenance in deteriorating production systems显示文摘Aghezzaf E H Najid N M 2008Information Sciences2008,178,33:1
4Single item lot sizing problems显示文摘Brahimi N Dauzere-Pems S Najid N M 2006European Journal of Operational Research2006,168,:1
5Excess 210Po in the coastal atmosphere 显示文摘GUEBUEM K NAJID H THOMAS M C 2000Tellus2000,52,:1
6Integrated production planning and preventive maintenance in deteriorating production systems 显示文摘Aghezzaf E H Najid M N 2008Information Sciences2008,178,17:1
7Single item lot sizing problems 显示文摘Brahimi N Dauzere-Pere S Najid NM 2006Oper Res2006,168,:1
8An Efficient Algorithm for the Multi-mode Resource Constrained Project Scheduling Problem with Resource Flexibility显示文摘Najid N M Arroub M 2010International Journal of Mathematics in Operational Re-search2010,2,6:1
9Integrated production and preventive maintenance in production systems subject to random failures显示文摘AGHEZZAF E H NAJID M N 2008Information Sciences2008,178,17:1
10An integrated production and maintenance planning model with time windows and shortage cost显示文摘NAJID M N ALAOUI-SELSOULI M MOHAFID A 2011International Journal of Production Research2011,49,8:1
11Single item lot sizing problems显示文摘] Brahimi N Dauz~re-P6r~s S Najid N M 2006European Journal of Oper- ational Research2006,168,1:1
12Single item lot sizing problems显示文摘Nadjib Brahimi Stephane Dauzere-Peres Najib M Najid 2006European Journal of Operational Research2006,168,:1
13Integrated production and pr- eventive maintenance in production system subject to random failures显示文摘AGHEZZAF E H NAJID M N 2008Information Sciences2008,178,17:1
14Integrated production planning and preventive maintenance in deteriorating production systems显示文摘Aghezzaf E H Najid N M 2008Information Sciences2008,178,17:1
15Integrated production planning and preventive maintenance in deteriorating production systems 显示文摘Aghezzaf E H Najid N M 2008Information Sciences2008,178,:1
16An integrated production and maintenance planning model with time windows and shortage cost显示文摘Najid N M Alaoui M Mohafid A 2011International Journal of Production Research2011,49,8:1
17Lagrangian relaxation based heuristic for an integrated production and maintenance planning problem显示文摘Alaoui M Mohafid A Najid N M 2012International Journal of Production Research2012,50,13:1
18Capacitated multi-item lot-sizing problems with time windows显示文摘Brahimi N Dauz6re-P6r6s S Najid N M 2006Operations Research2006,54,5:1
19Integrated production planning and preventive maintenance in deteriorating production systems显示文摘Aghezzaf E H Najid N M 2008Information Sciences2008,178,17:1
20An Efficient Algorithm for the Multi- mode Resource Constrained Project Scheduling Problem with Resource Flexibility 显示文摘Najid N M Arroub M 2010International Journal of Mathematics in Operational Re- search2010,2,6:1
返回顶部 每页显示:
共2页 首页 上一页 第1页 下一页 末页 /2 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费