维普中文期刊产品整合服务

Pantograph and catenary system with double pantographs for high-speed trains at 350 km/h or higher

查看全文 作  者:Weihua ZHANG Ning ZHOU Ruiping LI Guiming MEI Dongli [1]SONG 高影响力作者 机构地区:[1]Traction Power State Key Laboratory, Southwest Jiaotong University, Chengdu 610031, China高影响力机构 出  处:《Journal of Modern Transportation》索引2011年第19卷第1期,共5页高影响力期刊 摘  要:The paper is aimed at developing an optimized design of the pantograph and catenary system with double pantographs at a speed of 350 km/h for the Wuhan-Guangzhou high-speed railway.First,the pantograph and catenary system for the Beijing-Tianjin high-speed railway was analyzed to verify whether its design objective could be fulfilled.It shows that the system is not able to satisfy the requirement of a sustainable running speed of 350 km/h.Then a new scheme for the pantograph and catenary system is proposed through optimization and renovation of the structure and parameters of the pantograph and catenary system,including the suspension type of the catenary,tension of the contact wire,and space between two pantographs.Finally,the dynamic performance of the new system was verified by simulation and line testing.The results show that the new scheme of the pantograph and catenary system for the WuhanGuangzhou high-speed railway is acceptable,in which the steady contact between the rear pantograph and the catenary at the space of 200 m can be maintained to ensure the current-collection quality.A current collection with double pantographs at a speed of 350 km/h or higher can be achieved. 关 键 词:接触网系统 受电弓 公里 高速列车 小时 优化设计 高速铁路 可持续发展
相关文献

参考文献(6)

引证文献(12)

耦合文献(113)

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费