维普中文期刊产品整合服务
26篇 您的检索式:作者名="Gransberg"
    题名 作者 年代 出处 被引量
1Cost Engineering Optimum Seaport Capacity显示文摘Douglas D Gransberg John P Basilotto 1998Cost Engineering1998,40,9:1
2Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance显示文摘Gransberg D D Zaman M 2005Journal of Trans- portation Engineering2005,131,3:1
3Antiparetic and antispasticeffects induced by tizanidine in patients with spastic paresis显示文摘Knutsson E Martensson A Gransberg L 1982JNeurol Sci1982,53,2:1
4Analysis of emulsion and hot asphalt cement chip seal performance显示文摘Gransberg D D Zaman M 2012Jour- nal of Transportation Engineering2012,131,3:1
5Quantitative analysis of partered project performance显示文摘Gransberg D D Dillon W D Reynolds L 2005Journal of construction engineering and management2005,,6:1
6Antiparetic and antispastic effects induced by tizanidine in patients with spastic paresis显示文摘 Martensson A Gransberg L 1982J Neurol Sci1982,53,2:1
7Quantitative A-nalysis of Partnered Project Performance显示文摘Gransberg D D Dillon W D Reynolds L 1999Journal of Con-struction Engineering and Management1999,,125:1
8Analysis of owner's design and construction quality management:Approaches in design/build projects显示文摘Gransberg Douglas D Molenaar Keith 2004Journal of Managment in Engineering2004,20,6:1
9Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance显示文摘Douglas D Gransberg Musharraf Zaman 2005Jour- nal of Transportation Engineering(ASCE)2005,131,3:1
10Design-builder selection for small highway projects显示文摘Molenaar K R Gransberg D D 2001Journal of Management in Engineering2001,17,4:1
11Measuring partnered project performance显示文摘Douglas D Gransberg Howard L Roynolds Jaek Boyd 1999Cost Engineering1999,,10:1
12Life Cycle Costing for Engineers显示文摘Gransberg D 2010Construction Man- agement and Economics2010,28,10:1
13Influences of muscle stretch reflexes on voluntary, velocity-controlled movements in spastic paraparesis显示文摘Knutsson E Martensson A Gransberg L 1997Brain1997,120,11:1
14Measuring partnered project performance 显示文摘Douglas D Gransberg Howard L Roynolds Jack Boyd 1999Cost Engineering1999,,10:1
15Design/Build in Transportation from the Research Perspective显示文摘Douglas D. Gransberg 2003Leadership and Management in Engineering2003,,3:1
16Selection of project delivery method in transit: drivers and objectives 显示文摘Touran A Gransberg D D Molenaar K R 2011Journal of Management in Engineering2011,27,1:1
17Quatitative analysis of partnered project performance显示文摘Gransberg D D Dillon W Reynolds Lee 1999Journal of Engineering and Management1999,125,3:1
18Selection of project delivery method in transit:drivers and objectives显示文摘TOURAN A GRANSBERG D D MOLENAAR K R 2011Journal of Management in Engineering2011,27,1:1
19Measuring partnered project performance 显示文摘Douglas D Gransberg Howard L Roynolds Jack Boyd 1999Cost Engineering1999,,10:1
20Measuring partnered project performance显示文摘Douglas D Gransberg Howard L Roynolds 1999Cost Engineering1999,41,10:1
返回顶部 每页显示:
共2页 首页 上一页 第1页 下一页 末页 /2 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费