维普中文期刊产品整合服务
8篇 您的检索式:作者名="Gurmel"
    题名 作者 年代 出处 被引量
1Youth suicide trends in Australian metropolitan and non - metropolitan areas显示文摘Wilkinson D Gurmell D 2000Australia and New Zealand Journal of Psychiatry2000,34,5:1
2RAFT mediated polysaccharide copolymers显示文摘FLEET R MCLEARY J B GURMEL V 0,,09:1
3Investigating internal erosion using a miniature resistivity array显示文摘B. Burns R. Barker Gurmel S Ghataora 2005NDT and E International2005,,2:1
4Barium–borate–flyash glasses: As radiation shielding materials显示文摘Sukhpal Singh Ashok Kumar Devinder Singh Kulwant Singh Thind Gurmel S. Mudahar 2007Nuclear Inst and Methods in Physics Research B2007,,1:1
5A differential series of pepper (Capsicum annuum) lines delineates fourteen physiological races Phytophora capsici 显示文摘Bonnie R Glosier Ebenezer A Ogundiwin Gurmel S Sidhu 2008Euphytica2008,162,:1
6A differential series of pepper (Capsicum annuum) lines delineates fourteen physiological races of Phytophthora capsici显示文摘BONNIE R GURMEL S JAMES P 2008Euphytica2008,162,1:1
7Asphalt Pavement Cold Recycling and Basic Characteristics of RAP Materials and their application显示文摘In the developed countries significant proportion of reclaimed asphalt pavement(RAP)materials are used in the construction of pavements.Until recently,milled asphalt from old roads was sent to tip as waste.However,in recent years there has been increased use of waste materials in many road projects within the capital city and federal road network.Use of RAP materials is relatively new to Ethiopia and understanding its characteristics and related technology with all its potential environmental,economic and social benefits is important.Cold recycling is desired due to its potential economic benefit.In this study characteristics of RAP materials are assessed both from literature and laboratory investigations in order to better understand its performance and use.Questionnaire survey was undertaken to identify factors that are hindering recycling of materials in pavements in Ethiopia and what is to be done to overcome these factors.A policy statement is derived to support a quick start and implementation of asphalt pavement recycling in Ethiopia.Currently,a huge asphalt pavement network is being constructed and virgin construction material exploration and import materials such as bitumen is costing the country a lot of money.Over USD 7 Billion worth asphalt pavement have been constructed over the last 23 years to serve the public and freight transport,which requires about USD 176 million annually for maintenance and rehabilitation works.Therefore,any saving obtained from recycling will have meaningful impact on cost saving and environment preservation.Alemayehu A.Endale Gurmel S.Ghataora Michael P.N.Burrow 2022Journal of Civil Engineering and Architecture2022,16,1:0
8Railway Foundation Design Principles显示文摘Michael Peter Nicholas Burrow Gurmel S. Ghataora Harry Evdorides 2011Journal of Civil Engineering and Architecture2011,5,3:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费