维普中文期刊产品整合服务
9篇 您的检索式:作者名="Haydar E"
    题名 作者 年代 出处 被引量
1Nonlinear flow and heat transfer dynamics of impinging jets onto slightly-curved surfaces显示文摘Haydar E Bulent Y Nevin C 2007Applied Thermal Engineering2007,27,1415:1
2Almost compactness and near compactness in fuzzy topological spaces显示文摘Haydar E S 1987Fuzzy Sets and Systems1987,22,:1
3Mitotic spindle rotation and mode of cell division in the developing telencephalon显示文摘Haydar TF Ang E Jr Rakic P 2003Proc Natl Acad Sci USA2003,100,5:1
4A New Production Technique for Rotameters and Venturimeters 显示文摘TanylldlzlV HAYDAR E 2006Measurement2006,39,:1
5Multi-criteria Selec- tion for a Wind Observation Station Location Using Analytic Hierarchy Process显示文摘Haydar A Senol E Eylem K 2004Renewable Energy2004,29,8:1
6Molecular and morphological heterogeneity of neural precursors in the mouse neocortical proliferative zones显示文摘Gal J S Morozov Y M Ayoub A E Chatterjee M Rakic P Haydar T F 0,,:1
7Four-dimensional migratory coordinates of GABAergic interneurons in the developing mouse cortex显示文摘Ang E S Jr Haydar T F Gluncic V 2003J Neurosci2003,23,13:1
8Heterogeneity in ventricular zone neural precursors contributes to neuronal fate diversity in the postnatal neocortex显示文摘Stancik E K Navarro-Quiroga I Sellke R Haydar T F 0,,:1
9An innovative design of septic tank for wastewater treatment and its performance evaluation: An applicable model for developing countries显示文摘A study was carried out to evaluate the treatment efficiency of modified model of septic tank(ST)for the treatment of domestic wastewater.The objective was to explore the possibility of increasing the removal efficiency,at household level,thereby reducing cost and treatment burden on city level treatment plants.For this purpose,a bench scale model of ST was prepared and operated continuously for 78 days at different detention times i.e.,48,24 and 12 h and at two reactor temperatures viz.15°C and 25°C.Domestic wastewater was fed to the bench scale ST without pre-settling.Research was conducted under two different arrangements.Firstly,by installing baffles in the bench scale ST(called Run-1 setup),and secondly by installing perforated plates between the baffles(called Run-2 setup).Results demonstrated that Run-2 setup is better than Run-1 setup.Temperature significantly affects the efficiency.Detention time of 24 h was found feasible.Run-2 setup demonstrated a percentage BOD removal of 45%with effluent BOD of 113 mg·L^(-1)at 15°C and 85%removal with effluent BOD of 31 mg·L^(-1)at 25°C.It is concluded that if a modified design of ST using Run-2 setup is provided at household level,the effluent coming out of the house will meet the National Environmental Quality Standards(NEQS)when reactor temperature is close to 25°C.Development authorities are suggested to change their by-laws and make modified ST mandatory for all households.This may significantly reduce the cost and footprint of city level wastewater treatment plants being planned.Sajjad Haydar Mehwish Anis Gul E Hina Javed Anwar Aziz Mudasar Arbi 2018Chinese Journal of Chemical Engineering2018,26,4:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费