维普中文期刊产品整合服务
11篇 您的检索式:作者名="Neil Eldin"
    题名 作者 年代 出处 被引量
1Concurrent engineering: a schedule reduction tool显示文摘Neil N Eldin 1997Journal of Construction Engineering and Management1997,123,3:1
2A promising planning tool: Quality function deployment显示文摘Neil Eldin 2002Cost Engineer2002,44,:1
3Rubber tire particles as concrete aggregate 显示文摘Neil N Eldin A Hmed B Senouci 1993Journal of Materials in Civil Engineering1993,,4:1
4Rubber-tired particles as concrete aggregate显示文摘Eldin Neil N Senouci A B 1993Journal of Materials in Civil Engineering1993,5,4:1
5Rubber tire particles as concrete aggregate显示文摘NEIL N ELDIN AHMED BSENOUCI 1993Journal of Materials in Civil Engineering1993,5,4:1
6A promising Planning tool: Quality function deployment显示文摘Neil Eldin 2001Cost Engineer2001,,:1
7Rubber tire particles as concrete aggregate显示文摘Neil N Eldin Ahmed Bsenoucl 1993Journal of Materirals in Civil Engineering1993,5,4:1
8Rubber-tired particles as concrete aggregate显示文摘Eldin Neil N Senouci A B 1993Journal of Materials in Civil Engineering1993,5,4:1
9Measurement of Work Progress: Quantitative Technique 显示文摘Neil N Eldin 1989Journal of Construction Engineering and Management (S0733-9364)1989,115,3:1
10Rubber-tire particles as concrete aggregate显示文摘ELDIN NEIL N SENOUCI AHMED B 1993Journal of Materials in Civil Engineering1993,5,4:1
11A Model for Predicting Construction Worker Fatigue显示文摘Fatigue impairs workers’judgment,reduces their productivity,and jeop­ardizes their safety.The paper presents a tool to predict workers’fatigue based on their vital signs.An experimental study was conducted in which the heart rate and sleep quality for three individuals were monitored using fitness trackers(wearable sensors).The data collected were used to develop two models based on regression analysis and Artificial Neural Networks(ANN),to predict their fatigue level.A Borg’s scale was used to estimate the Rating of Perceived Exertion(RPE)of the participants.The two models were able to satisfactorily predict the RPE(workers fatigue level)with an average validity of 75%and 80%for the regression ANN models,respec­tively.The developed models can provide project managers and superinten­dents with early warning to avoid potential worker overexertion,injuries,and fatalities.Ahmed Senouci Surya Anuradha Garimella Kyungki Kim Neil Eldin 2022Journal of Smart Buildings and Construction Technology2022,4,2:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费