维普中文期刊产品整合服务
12篇 您的检索式:作者名="Sinan C"
    题名 作者 年代 出处 被引量
1A comparative study on the actual and estimated seismic response of Kiralkizi Dam in Turkey显示文摘Onder C K Sinan I N 2005J earthqu eng2005,9,:1
2Purifcation and characterization of glucose 6-phosphate dehydrogenase from sheep liver 显示文摘Vedat T Sinan A Mehmet C 2003Turk J Chem2003,,27:1
3Increased circu- lating soluble CD40 levels in patients with slow coronary flow phenomenon :An observational study显示文摘Murtaza ED Sinan AK Mustafa C 2013Anadolu Kar- diyol Derg2013,13,1:1
4Acquired hepatocere-bral degeneration:MR and pathologic findings显示文摘Jongwon L David L Sinan C 1998Am JNeuroradiol1998,19,:1
5Simultaneous determination of guaiphenesin and codeine phosphate in tablets by high-performance liquid chromatography显示文摘SINAN S AKAY C CEVHEROGLU 1999Ⅱ Farmaco1999,54,10:1
6Reversal of haemorrhagic shock in rats by tetrahydroaminoacridine显示文摘Vahide S Sinan C Sibel M 2001Pharmacology2001,62,:1
7Serum Uric Acid Is a Determinant of Metabolic Syndrome in a Population-Based Study显示文摘Altan Onat Hüseyin Uyarel Gülay Hergenc? Ahmet Karabulut Sinan Albayrak Ibrahim Sar? Mehmet Yaz?c? Ibrahim Kele? 2006American Journal of Hypertension2006,,10:1
8Reversal of haemorrhagic shock in rats by tetrahydroaminoacridine显示文摘Vahide S Sinan C Sibel M 2001Pharmacology2001,62,:1
9Centri-voltammetric dopamine detection显示文摘SINAN C S ESMA S YUDUM T 2014RSC Advances2014,4,31:1
10Increased Pulse Wave Velocity and Carotid Intima-Media Thickness in Patients with Ulcerative Colitis显示文摘Remzi Adnan Akdo?an Murtaza Emre Durako?lugil Sinan Altan Kocaman Yüksel ?i?ek Tu?ba Durako?lugil Elif Ergül Halil Rak?c? 2013Digestive Diseases and Sciences2013,,8:1
11Ambient concentrations and source apportionment of PCBs and trace elements around an industrial area in Izmir, Turkey显示文摘Banu C Sinan Y Abdurrahman 2007Chemosphere2007,69,:1
12A combo technology of autotrophic and heterotrophic denitrification processes for groundwater treatment显示文摘In this study,a sequential process(heterotrophic up-flow column and completely mixed membrane bioreactors)was proposed combining advantages of the both processes.The system was operated for 249 days with simulated and real groundwater for nitrate removal at concentrations varying from 25 to 145 mg·L^(-1) NO_(3)^(-)-N.The contribution of heterotrophic process to total nitrate removal in the system was controlled by dozing the ethanol considering the nitrate concentration.By this way,sulfur based autotrophic denitrification rate was decreased and the effluent sulfate concentrations were controlled.The alkalinity requirement in the autotrophic process was produced in the heterotrophic reactor,and the system was operated without alkalinity supplementation.Throughout the study,the chemical oxygen demand in the heterotrophic reactor effluent was(23.7±22)mg L^(-1) and it was further decreased to(7.5±7.2)mg·L^(-1) in the system effluent,corresponding to a 70%reduction.In the last period of the study,the real groundwater containing 145 mg·L^(-1) NO_(3)^(-)-N was completely removed.Membrane was operated without chemical washing in the first 114 days.Between days 115-249 weekly chemical washing was required.Cemile Seyma Arzum Yapıcı Dilan Toprak Müjgan Yıldız Sinan Uyanık Yakup Karaaslan Deniz Uçar 2021Chinese Journal of Chemical Engineering2021,34,9:0
返回顶部 每页显示:
共1页 首页 上一页 第1页 下一页 末页 /1 跳转

网站首页 | 关于我们 | 联系我们 | 产品服务 | 客服中心 | 广告服务 | 版权声明 | 网站联盟 | 友情链接 | 售卡网点

版权所有© 渝B2-20050021-1 渝公网安备 50019002500403号 违法和不良信息举报中心

互联网出版许可证 新出网证(渝)字10号 全国400电话 - 免长途话费