|
|
|
题名
|
作者
|
年代
|
出处
|
被引量
|
| 1 | QTL IciMapping:Integrated software for genetic linkage map construction and quantitative trait locus mapping in biparental populations显示文摘QTL Ici Mapping is freely available public software capable of building high-density linkage maps and mapping quantitative trait loci(QTL) in biparental populations. Eight functionalities are integrated in this software package:(1) BIN: binning of redundant markers;(2) MAP: construction of linkage maps in biparental populations;(3) CMP: consensus map construction from multiple linkage maps sharing common markers;(4) SDL: mapping of segregation distortion loci;(5) BIP: mapping of additive, dominant, and digenic epistasis genes;(6) MET: QTL-by-environment interaction analysis;(7) CSL: mapping of additive and digenic epistasis genes with chromosome segment substitution lines; and(8) NAM: QTL mapping in NAM populations. Input files can be arranged in plain text, MS Excel 2003, or MS Excel 2007 formats. Output files have the same prefix name as the input but with different extensions. As examples, there are two output files in BIN, one for summarizing the identified bin groups and deleted markers in each bin, and the other for using the MAP functionality. Eight output files are generated by MAP, including summary of the completed linkage maps, Mendelian ratio test of individual markers, estimates of recombination frequencies, LOD scores, and genetic distances, and the input files for using the BIP, SDL,and MET functionalities. More than 30 output files are generated by BIP, including results at all scanning positions, identified QTL, permutation tests, and detection powers for up to six mapping methods. Three supplementary tools have also been developed to display completed genetic linkage maps, to estimate recombination frequency between two loci,and to perform analysis of variance for multi-environmental trials. | Lei Meng Huihui Li Luyan Zhang Jiankang Wang | 2015 | The Crop Journal2015,3,3: | 174 |
| 2 | Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam显示文摘With the enlargement of core rockfill dam construction scale and the improvement of construction mechanization level, the traditional manual construction quality control method is now difficult to meet the quality and safety demands of modern dam construction, so automatic and real-time dam construction quality monitoring with high-techs is urgently needed. The paper makes theoretical research on construction quality real-time monitoring and system integration of core rockfill dam, proposes implementation method and integrated solution of construction quality real-time monitoring of core rockfill dam construction process, realizes refining, all-whether, entire-process and real-time control and analysis on key links of dam construction, and introduces the application of the construction quality real-time monitoring and system integration technology to a practical core rockfill dam project. | ZHONG DengHua CUI Bo LIU DongHai TONG DaWei | 2009 | Science China(Technological Sciences)2009,52,11: | 59 |
| 3 | 水利水电工程施工安全管理与安全控制显示文摘针对事故隐患,论述了事故隐患与危险源关系,指出了事故隐患形成原因,并提出了排查事故隐患与治理整改方案、防范及控制措施,以供水利水电工程安全管理借鉴。 | 郑霞忠 肖玲 张光飞 | 2010 | 水电能源科学2010,28,10: | 54 |
| 4 | Urban land expansion and arable land loss of the major cities in China in the 1990s显示文摘Based on the land-use data in 1990 and 2000, determined by interpreting Landsat Thematic Mapper (TM) imagery, this paper defines the extent of urban construction land, and extracts patches of urban construction land of 145 cities with the largest areas in 1990 and arable land patches around these cities. With these data, this paper analyzes the characteristics of ur- ban construction land expansion and the consequent arable land loss in East, Middle and West China, and further identifies the social, economic and spatial factors of the urban land use changes, using GIS (Geographical Information System) and multivariate regression approaches. The results show that total urban land of the 145 cities expanded by 39.8%, with about 70% of the new urban land converted from arable land in the 1990s. The urban land expansion varied among the three regions, with a value of 43.0% in the East, 33.1% in the West (33.1%) and 17.8% in the Middle. Moreover, mean urban construction land per capita increased by10.7% in the East, but it decreased by 7.7% in the Middle, 1.4% in the West. Statistical analysis indicated that total wages of staff and workers could best explain the differences of urban land expansion. | TAN Minghong LI Xiubin LU Changhe | 2005 | Science China Earth Sciences2005,48,9: | 32 |
| 5 | SOME NEW CONSTRUCTIONS OF CARTESIAN AUTHENTICATION CODES FROM SYMPLECTIC GEOMETRY显示文摘SOMENEWCONSTRUCTIONSOFCARTESIANAUTHENTICATIONCODESFROMSYMPLECTICGEOMETRYYOUHong;GAOYou(NortheastNormalUniversity,Changchun130... | YOU Hong GAO You(Northeast Normal University, Changchun 130024) | 1994 | Systems Science and Mathematical Sciences1994,7,4: | 31 |
| 6 | Theory on real-time control of construction quality and progress and its application to high arc dam显示文摘A complete scheme for solving the key scientific problems associated with high-standard,high-intensity continuous construction of high arch dams was presented. First,based on a coupling analysis of construction system decomposition and coordination for a high arc dam,a mathematical model for real-time control of construction quality and progress that considers complex constraints was developed. Second,a method of progress control was proposed based on a dynamic simulation. Third,a dynamic quality control mechanism was established based on construction information collected using a PDA. Fourth,a system for integrating collected information,progress simulation and quality control analyses under a network environment was developed. Finally,these methods were applied to a practical project to show that each aspect of a construction process can be managed effectively and that real-time monitoring and feedback control can be realized. Our methods provide new theoretical principles and technical measures for quality and progress control in the high arc dam construction process. | ZHONG DengHua1, REN BingYu1, LI MingChao1, WU BinPing1 & LI MingChuan2 1 Department of Hydraulic and Hydroelectric Engineering, School of Civil Engineering, Tianjin University, Tianjin 300072, China 2 Ertan Hydropower Development Company, Ltd., Chengdu 610051, China | 2010 | Science China(Technological Sciences)2010,53,10: | 18 |
| 7 | One-Step-Installation of Offshore Wind Turbine on Large-Scale Bucket-Top-Bearing Bucket Foundation显示文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year. | 丁红岩 练继建 李爱东 张浦阳 | 2013 | Transactions of Tianjin University2013,19,3: | 16 |
| 8 | Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM显示文摘 | Mingjiang Deng | 2018 | Engineering2018,4,1: | 14 |
| 9 | The plant cell wall: Biosynthesis, construction, and functions显示文摘The plant cell wall is composed of multiple biopolymers, representing one of the most complex structural networks in nature. Hundreds of genes are involved in building such a natural masterpiece. However, the plant cell wall is the least understood cellular structure in plants. Due to great progress in plant functional genomics,manyachievementshavebeenmadein uncovering cell wall biosynthesis, assembly, and architecture, as well as cell wall regulation and signaling. Such information has significantly advanced our understanding of the roles of the cell wall in many biological and physiological processes and has enhanced our utilization of cell wall materials. The use of cutting-edge technologies such as single-molecule imaging,nuclear magnetic resonance spectroscopy, and atomic force microscopy has provided much insight into the plant cell wall as an intricate nanoscale network, opening up unprecedented possibilities for cell wall research. In this review,we summarize the major advances made in understanding the cell wall in this era of functional genomics, including the latest findings on the biosynthesis, construction, and functions of the cell wall. | Baocai Zhang Yihong Gao Lanjun Zhang Yihua Zhou | 2021 | Journal of Integrative Plant Biology2021,63,1: | 11 |
| 10 | Lipschitz equivalence of generalized {1,3,5}-{1,4,5} self-similar sets显示文摘This paper investigates the Lipschitz equivalence of generalized {1,3,5}-{1,4,5} self-similar sets D = (r1D) ∪ (r2D + (1 + r1 - r2 - r3)/2) ∪ (r3D + 1 - r3) and E = (r1E) ∪ (r2E + 1 - r2 -r3) ∪ (r3E + 1 - r3),and proves that D and E areLipschitz equivalent if and only if there are positive integers m and n such that rm1= rn3. | Li-feng XI~(1+) Huo-jun RUAN~2 1 Institute of Mathematics,Zhejiang Wanli University,Ningbo 315100,China 2 Department of Mathematics,Zhejiang University,Hangzhou 310027,China | 2007 | Science China Mathematics2007,50,11: | 11 |
| 11 | Evaluation of Tubal Patency with Transvaginal Three-dimensional Hysterosalpingo-contrast Sonography显示文摘Objective To investigate diagnostic efficacy of transvaginal three-dimensional hysterosalpingo-contrast sonography(3D-Hy Co Sy) in assessing tubal patency with chromolaporoscopy. Methods A total of 157 infertile women underwent 3D-Hy Co Sy to evaluate tubal patency. Among these patients, 39 patients were also examined by chromolaporoscopy. The concordance of the two clinical assessment methods was analyzed by the Kappa coefficient test. Results Among the 306 oviducts examined by 3D-Hy Co Sy, 99(32.4%) were patent, 126(41.2%) partially obstructed, and 81(26.5%) completely obstructed. Diagnostic results with 3D-Hy Co Sy were not statistically different from those obtained in the 39 women(78 oviducts) who also underwent chromolaporoscopy, and the two methods showed a high concordance(κ=0.747, P=0.000). The 3D-Hy Co Sy procedure had a sensitivity of 84.8%(28/33), a specificity of 96.2%(25/26), and positive and negative predictive values of 93.3%(28/30) and 86.2%(25/29) respectively. Conclusion Transvaginal 3D-Hy Co Sy can accurately reveal the spatial path and morphology of the oviduct and is a safe and effective method to evaluate tubal patency. | Qi Cheng Sha-sha Wang Xian-sheng Zhu Fan Li | 2015 | Chinese Medical Sciences Journal2015,30,2: | 11 |
| 12 | Theory and practice of construction simulation for high rockfill dam显示文摘Construction simulation for high rockfill dam (CSHRD) is the technology that takes advantage of computer simulation to observe and analyze a complex construction process, which is useful for construction design and management. In this paper, the domestic and oversea research status of CSHRD is reviewed firstly, along with introduction of their present achievements and deficiencies, and the CSHRD theory is also described. Then, considering the influence of many stochastic factors, integrated simulation for high rockfill dam construction (HRDC) is presented with technologies of cycle operation network (CYCLONE) and computer simulation. It rationally combines two subsystems in HRDC, namely haulage and placement of rockfill subsystem, which reflects the actual construction objectively. Important parameters, such as the haulage intensity and traffic density, are obtained, and the process of CSHRD is represented intuitively in dynamic visualization. All of these help engineers to make rapid decisions in HRDC scientifically. | ZHONG DengHua ZHANG Ping WU KangXin | 2007 | Science China(Technological Sciences)2007,50,z1: | 10 |
| 13 | Local structure-preserving algorithms for partial differential equations显示文摘In this paper, we discuss the concept of local structure-preserving algorithms (SPAs) for partial differential equations, which are the natural generalization of the corresponding global SPAs. Local SPAs for the problems with proper boundary conditions are global SPAs, but the inverse is not necessarily valid. The concept of the local SPAs can explain the difference between different SPAs and provide a basic theory for analyzing and constructing high performance SPAs. Furthermore, it enlarges the applicable scopes of SPAs. We also discuss the application and the construction of local SPAs and derive several new SPAs for the nonlinear Klein-Gordon equation. | WANG YuShun WANG Bin QIN MengZhao | 2008 | Science China Mathematics2008,51,11: | 10 |
| 14 | Research on the evaluation model of the modernization level of urban construction in Jiangsu Province,China显示文摘The modernization of urban construction is a key index in the process of urbanization,and also is an important index to measure the level of socio-economic and cultural development.This paper analyzes and explores the related concepts of modernization of urban construction,analyzes the situation and identity of urban construction layer by layer so as to establish an evaluation index system of the modernization level of urban construction and then the paper evaluates the modernization level of urban construction from four different angles,which are the perspectives of the urban planning control,the level of urban facilities,urban management,urban construction funds.It later analyzes the evaluation results by choosing Jiangsu Province as a research hierarchy from the scale chains of urban study and makes efforts to the operative and directive development direction. | YANG JunYan1 & CHEN Wen2 1 School of Architecture,Southeast University,Nanjing 210096,China 2 Nanjing Institute of Geography and Limnology,Chinese Academy of Sciences,Nanjing 210008,China | 2010 | Science China(Technological Sciences)2010,53,9: | 10 |
| 15 | 油田企业绿色文化建设研究——以胜利油田为例显示文摘随着社会经济的发展,环境问题日益严重,可持续发展成为社会经济发展的主题。在这种背景下,企业文化建设逐步受到管理者的重视,而企业绿色文化建设成为企业文化建设的一个重要内容,石油企业的绿色文化建设也日益受到人们的关注。研究油田企业的绿色文化建设不但有利于促进油田企业的可持续发展,同时对其他能源产业的企业具有重要的借鉴意义,在绿色文化建设的精神、制度、行为以及形象层面具有重要的参考价值。 | 宿铁军 | 2010 | 科学决策2010,,12: | 9 |
| 16 | Complete fuzzy scheduling and fuzzy earned value management in construction projects显示文摘This paper aims to present a comprehensive proposal for project scheduling and control by applying fuzzy earned value.It goes a step further than the existing literature:in the formulation of the fuzzy earned value we consider not only its duration,but also cost and production,and alternatives in the scheduling between the earliest and latest times.The mathematical model is implemented in a prototypical construction project with all the estimated values taken as fuzzy numbers.Our findings suggest that different possible schedules and the fuzzy arithmetic provide more objective results in uncertain environments than the traditional methodology.The proposed model allows for controlling the vagueness of the environment through the adjustment of the α-cut,adapting it to the specific circumstances of the project. | José Luís PONZ-TIENDA Eugenio PELLICER Víctor YEPES | 2012 | Journal of Zhejiang University-Science A(Applied Physics & Engineering)2012,13,1: | 9 |
| 17 | Method of Characteristic for Functional Equations in Polynomial Form | Janusz Matkowski (Department of Mathematics,Technical University of Bielsko-Biala 43-309 Bielsko-Biala,Poland)Zhang Weinian (Department of Mathematics,Sichung Union University,East Area,Chengdu 610041,China) | 1997 | Acta Mathematica Sinica,English Series1997,13,3: | 8 |
| 18 | 探索长株潭城市群建设用地的时空变化及重心移动(英文)显示文摘Urban agglomeration is caused by the continuous acceleration of the urbanization process in China. Studying the expansion of construction land can not only know the changes and development of urban agglomeration in time, but also obtain the great significance of the future management. In this study, taking Changsha-Zhuzhou-Xiangtan(Chang-Zhu-Tan) urban agglomeration in Hunan province as a study area, Landsat images from 1995 to 2014 and Autologistic-CLUE-S model simulation data were used. Moreover, several factors including gravity center, direction, distance and landscape index were considered in the analysis of the expansion. The results revealed that the construction area increased by 132.18%, from 372.28 km^2 in 1995 to 864.37 km^2 in 2014. And it might even reach 1327.23 km^2 in 2023. Before 2014, three cities had their own respective and discrete development directions. However, because of the integration policy implementation in 2008, the Chang-Zhu-Tan began to gather, the gravity center moved southward after 2014, and the distance between cities decreased, which was in line with the development plan of urban expansion. The research methods and results were relatively reliable, and these results could provide some reference for the future land use planning and spatial allocation in the urbanization process of Chang-Zhu-Tan urban agglomeration. | 荔琢 蒋卫国 王文杰 雷璇 邓越 | 2019 | Journal of Geographical Sciences2019,29,8: | 8 |
| 19 | Acoustic emission monitoring of rockbursts during TBM-excavated headrace tunneling at Jinping Ⅱ hydropower station显示文摘To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with the tunnel boring machine(TBM). The paper attempts to employ the acoustic emission(AE) to study the AE characteristics and distribution of rockburst before and after TBM-excavated tunnel. It is known that the headrace tunnel #2, excavated by the drill-and-blast(D&B) method, is ahead of the headrace tunnel #3 that is excavated by TBM method. The experimental sub-tunnel #2–1, about 2000 m in depth and 13 m in diameter, between the two tunnels is scheduled. In the experimental sub-tunnel #2–1, a large number of experimental boreholes are arranged, and AE sensors are installed within 10 m apart from the wall of the headrace tunnel #3. By tracking the microseismic signals in rocks, the location, frequency, quantity, scope and intensity of the microseismic signals are basically identifed. It is observed that the AE signals mainly occur within 5 m around the rock wall, basically lasting for one day before tunnel excavation and a week after excavation. Monitoring results indicate that the rockburst signals are closely related to rock stress adjustment. The rock structure has a rapid self-adjustment capacity before and after a certain period of time during tunneling. The variations of rock stresses would last for a long time before reaching a fnal steady state. Based on this, the site-specifc support parameters for the deep tunnels can be accordingly optimized. | Wuwei Cheng Wenyou Wang Shiqiang Huang Peng Ma | 2013 | Journal of Rock Mechanics and Geotechnical Engineering2013,5,6: | 6 |
| 20 | Seismic responses of high concrete face rockfill dams:A case study显示文摘Seismic responses of the Zipingpu concrete face rockfill dam were analyzed using the finite element method. The dynamic behavior of rockfill materials was modeled with a viscoelastic model and an empirical permanent strain model. The relevant parameters were obtained either by back analysis using the field observations or by reference to parameters of similar rockfill materials. The acceleration responses of the dam,the distribution of earthquake-induced settlement, and the gap propagation under the concrete slabs caused by the settlement of the dam were analyzed and compared with site investigations or relevant studies. The mechanism of failure of horizontal construction joints was also analyzed based on numerical results and site observations. Numerical results show that the input accelerations were considerably amplified near the top of the dam, and the strong shaking resulted in considerable settlement of the rockfill materials, with a maximum value exceeding 90 cm at the crest.As a result of the settlement of rockfill materials, the third-stage concrete slabs were separated from the cushion layer. The rotation of the cantilever slabs about the contacting regions, under the combined action of gravity and seismic inertial forces, led to the failure of the construction joints and tensile cracks appeared above the construction joints. The effectiveness and limitations of the so-called equivalent linear method are also discussed. | Sheng-shui Chen Zhong-zhi Fu Kuang-ming Wei Hua-qiang Han | 2016 | Water Science and Engineering2016,9,3: | 6 |